 1.

 Works Related to Refinery Units:-

 

-

Sulfur Recovery Unit Project, at an estimated cost of JD (12) million.

 

-

Purchasing of new LPG cylinders (12 ½ kg of capacity) , to replace the write-off LPG cylinders at an annual rate not less than 250,000 cylinders , at an estimated cost of JD (4.5) million.

 

-

Purchasing spare heat exchangers and tube bundles for Refinery units, at an estimated cost of JD (1,060,000).

 

-

Purchasing of two gas compressors for FCC unit to replace the existing ones , at an estimated cost of JD (1,000,000).

 

-

Periodical intensive inspection of LPG sphere tanks at Refinery site, at an estimated cost of JD (700,000).

 

-

Installing electricity saving panels and improving the power factor on electrical transformers, at an estimated cost of JD (700,000) .

 

-

Updating the circuit breakers in the main 3KV sub-stations in the Refinery at an estimated cost of JD (600,000) .

 

-

 

Installation of SCADA system for the control of new protection units (Siemens Relays), at an estimated cost of JD (500,000).

 

-

Purchasing (62) radars for level and temperature measurement and installing them on the tanks, at a total cost of JD (500,000). 

 

-

Purchasing necessary equipment for full surface fire fighting of tanks, as per Wiliams Fire  recommendations, at an estimated cost of JD(500,000) .

 

-

Modifications of part of Refinery fire fighting water network  , at an estimated cost of JD (450,000).

 

-

Purchasing three mobile bulk foam tankers , each (18000) litres capacity, at an estimated cost of JD (400,000).

 

-

Purchasing new steam generator and superheater for Asphalt Unit , at an estimated cost of JD (400,000).

 

-

Closed Camera T.V for the Refinery site and Aqaba South Depots, at an estimated cost of JD (400,000)

 

-

Purchasing Rescue and Hazmat vehicle, at an estimated cost of JD (400,000) .

 

-

Supply of surface coating facilities for 12 ½ kg LPG cylinders of capacity 150 cylinders per hour , at an estimated cost of JD (400,000).

 

-

Installation and startup of distributed control system (DCS) for boilers No.7001 and 7002 , at a total cost of JD (400,000)

 

-

Connecting the Refinery fire fighting water network with Water Authority Network, at an estimated cost of JD (370,000).

 

-

Design, supply and commissioning of an automatic backwash feed filtering system for naphtha hydrotreating unit , at an estimated cost of JD (300,000).

 

-

Testing of crude oil storage tank bottoms at the Refinery site, at an estimated cost of JD (250,000) .

 

-

Purchasing tubes for boilers No. A and B , at a total cost of JD (250,000)

 

-

Supplying and installing electrical network protection equipment, at an estimated cost of JD (242,000).

 

-

Changing the central heating systems of the Company installations at railway eastern area from steam to hot water, at an estimated cost of JD (200,000)

 

-

Consulting services for Process Hazard Analysis (PHA) for safe operation for setting work procedure similar to that adopted in international refineries, and Mechanical Integrity system for equipment if fields of maintenance, inspection and operation, at an estimated cost of JD (200,000).

 

-

Purchasing of two air compressors No. 306- MC-1 A& B for Merox -2 unit, at an estimated cost of JD (170,000).

 

-

Drilling a new water well or rehabilitation of well No. (6), at an estimated cost of JD (150,000).

 

-

Periodical intensive inspection of fire fighting networks, at an estimated cost of JD (150,000).

 

-

Purchasing and installation of new transformers instead of the old ones, at an estimated cost JD (150,000).

 

 

Consulting services for upgrading the petroleum products loading systems at Zarka site , at an estimated cost of JD (150,000).

 

--

Purchasing three spare tube bundles for heat exchangers No. 301-E1A/B/C of Topping  Unit No.3, at an estimated cost of JD (140,000).

 

-

Replacement of two gas compressors No. C4-A/B of Hydrogen unit by new ones, at an estimated cost of JD (125,000).

 

-

Modification of cooling water towers packing materials, at an estimated cost of JD (120,000).

 

-

Purchasing replacement  pumps for Refinery Units and Oil Separation Unit , at an estimated cost of JD (115,000).

 

-

Purchasing two bottom reduced pumps No. 301-P108A&B for Topping  Unit No.3, at an estimated cost of JD (110,000).

 

-

Purchasing and installing a new gas compressor to utilize the total at storage capacity of Hydrogen bullets, at an estimated cost of JD (100,000).

 

-

Purchasing equipment for detecting and measuring leaks of  toxic gases, at an estimated cost of JD (100,000).

 

-

Renovation of  vibration systems of steam turbines of Generators No. G3 & G4, at an estimated cost of JD (100,000).

 

-

Consulting services for electrical network, at an estimated cost of JD (96,000).

 

-

Purchasing and installing as stand-by pump for Naphtha Hydrotreating Unit feed, of capacity (100 m3), at an estimated cost of JD (65,000).

 

-

Installation of pressurizing central air-conditioning and ventilation system  for the control room of FCC, Topp.1 and Vac.1 units, at an estimated cost of JD (60,000).

 

-

Purchasing pressure vessel No. 304-V7X for Naphtha Hydrotreating Unit, at an estimated cost of JD (60,000).

 

-

Purchasing and installing remote operation and isolation valves (ROIV) for the pumps of high temperature service, at an estimated cost of JD (50,000).

 

-

Design and supply of a fire fighting system for the Refinery laboratories, at an estimated cost of JD (50,000).

 

-

Purchasing two replacement fuel oil pumps, at an estimated cost of JD (40,000).

 

-

Replacing steel pipes of air conditioning system for Refinery Administration Building with plastic pipes, at an estimated cost of JD (35,000).

 

-

Purchasing ten loading arms to replace existing ones at loading platforms, at an estimated cost of JD (30,000).

 

-

Purchasing trays for Topping Unit No.1, at an estimated cost of JD (30,000).

 

-

Renovation of fire fighting systems of central computer rooms at Amman and Zarka sites, at an estimated cost of JD (20,000).

 

 

 

2.

Works Related to LPG Filling Stations, Factories, Airport Service  Stations  and Aqaba Depots:-

 

-

Periodical intensive inspection of LPG sphere at Amman LPG Filling Station, at an estimated cost of JD (250,000).

 

-

Purchasing and installing a water spray cooling system for LPG piping located outside LPG pumps area, at Amman LPG Filling Station, at an estimated cost of JD (50,000).

 

-

Purchasing and installing a Jokey pump at Saladin LPG Filling Station, at an estimated cost of JD (10,000).

 

 

 

3.

Construction Works:

 

-

Maintenance of the concrete pavements at the Refinery process units, at an estimated cost of JD (650,000)

 

-

Expanding store hangar at Aqaba South Depots, at an estimated cost of JD (250,000)

 

-

Maintenance of main laboratories, replacement of the furniture and supply of new industrial lab cupboards for the remaining halls of laboratories at the Refinery, at an estimated cost of JD (200,000)

 

-

Protection of air cooled condensers steel structures from fire inside Refinery units, at an estimated cost of JD (200,000).

 

-

Re-asphalting damaged roads and yards, and levelling new roads at the Refinery planted areas, at an estimated cost of JD (100,000)

 

-

Renovating the entrance of the Refinery site, at an estimated cost of JD (100,000)

 

-

Maintenance of various buildings at the Refinery , at an estimated cost of JD (75,000)

 

-

Connecting the sewage systems of lube oil blending plant buildings with the main public sewage system, at an estimated cost of JD (65,000).

 

-

Construction of water and LPG evaporation pit at Aqaba South Depots, to meet environmental requirements, at an estimated cost of JD (60,000).

 

-

Construction of parking area for cars of Transportation Unit employees' cars at Zarka site, at an estimated cost of JD (60,000).

 

-

Installation of an emergency external steel escape stair and installation of fire resistant door for isolating the maintenance rooms, in the Head Offices building, at an estimated cost of JD (50,000).

 

-

Construction of rest house for labourers of Zarka LPG Filling Stations, at an estimated cost of JD (50,000).

 

-

Demolition and removal of the old Industrial Export stores, at an estimated cost of JD (50,000).

 

-

Construction of pillars and steel structures for cooling water rings of LPG sphere No. (S-303) at the Refinery, at an estimated cost of JD (40,000) .

 

-

Construction of new offices and electrical workshop at loading area, at an estimated cost of JD (40,000).

 

-

Construction of new Gym  at Residential Area , at an estimated cost of JD (40,000).

 

-

Connecting rain water drainage system of LPG Filling Station No. 2, at the Refinery site, to the nearby wadi, at a total cost of JD (30,000)





  