|
First : Main Completed
Projects:
|
|
Works Related to the Refinery Units:
|
|
Purchasing the following replacement equipment for Unibon
Unit, at a total cost of JD (7.145) million :
|
- Purchasing two reactors to replace existing ones , at a
total cost of JD (4.6 ) million.
|
- Purchasing three heat exchangers and stainless steel
piping circuit to replace existing ones , at a total cost of
JD (2.2) million.
|
- Purchasing four air cooled cells No. 308-E14A//D , of
updated design to replace existing bundles for Unibon
Reactor Product Condensers, at a total cost of JD (0.345)
million.
|
- Purchasing and installing a (2.4) MW diesel driven
electric generator for the power station, at a total cost of
JD (1.8) million.
|
- Purchasing and installing a Desalter Plant to remove
salt from crude oil in Topping III Unit, at a total cost of
JD (1.3) million.
|
- Purchasing the following spare equipment for various
Refinery units : air cooled heat exchangers, four
air cooled cells, at a total cost of JD (660,000)
|
- Purchasing two fire fighting multi purpose vehicles
(powder / foam), at a total cost of JD (600,000).
|
- Purchasing (48) radars for level and temperature
measurement and installing them on the tanks, at a total
cost of JD (500,000).
|
- Purchasing and installing two diesel engine driven main
fire fighting pumps, at a total cost of JD (280,000)
|
- Purchasing five spare pressure vessels for various
Refinery units to
replace existing ones, at a total cost of JD (250,000).
|
- Purchasing soot blowers for steam boilers Nos. 7001 and
7002, at a total cost of JD (200,000).
|
- Adding a new crude oil tank to Crude Oil Receiving
Station, using tank No. 15, at a total cost of JD (180,000)
|
- Installation and startup of distributed control system
(DCS) for boiler No.7004 , at a total cost of JD (100,000)
|
- Purchasing two submersible water well pumps, at a total
cost of JD (75,000).
|
- Purchasing three rubber lined pressure vessels for
Utilities Unit No. (2), at a total cost of JD (70,000).
|
- Converting Tank No. 35 for MTBE and unleaded gasoline
storage, at a total cost of JD (70,000).
|
- Installing a new fuel oil line to supply Third Expansion
Project Units, at a total cost of JD (50,000).
|
- Purchasing and installing new trays for Waste Water
Stripper(2) of Water Treatment Unit to improve its
efficiency , at a total cost of JD (50,000).
|
- Purchasing and installing an industrial water pump and
constructing a water collecting pit, at a total cost of JD
(50,000).
|
- Purchasing two electrical transformers (1250 KVA) for
sub-station, at a total cost of JD (33,000).
|
- Purchasing and installing automatic water draining
valves for one crude oil storage tank at the Refinery, at a
total cost of JD (30,000).
|
- Replacing part of blow down pipe line of old Refinery
units, at an estimated cost of JD (30,000).
|
|
|
|
|
- Levelling and re-asphalting damaged roads
and yards, and renovating existing curbstones and walkways
in the Refinery, at a total cost of JD (744,000)
|
-
Civil works for the upgrading of cathodic protection
systems project in the Refinery, at a total cost of JD
(346,000).
|
- Rehabilitation of the new canteen building for the
Refinery army guard, at a total cost of JD (178,000).
|
- Upgrading the capacity of Crude Oil Receiving Station by
adding (6) unloading points and installing steel supports
for fire fighting foam system, at a total cost of JD
(166,000)
|
- Various works including the construction of inspection
pits for vehicles in the Refinery, installation of 20" UPVC
drainage pipe for the draining of Refining water, replacing
damaged asphalt pavements with reinforced concrete
pavements, maintenance and reasphalting service roads in the
Refinery, construction of two offices for loading area exit
gate, maintenance of Operations Offices, construction of
reinforced concrete cable trench in Topping (1) unit and
other works, at a total cost of JD (155,000).
|
- Maintenance of the employees' residential apartments at
Aqaba, at a total cost of JD (148,000) .
|
-
Infrastructure for the Refinery's computer network
upgrading project, at a total cost of JD (140,000).
|
-
Construction of the infrastructure for installation of
radar level gauges on the Refinery tanks, at a total cost of
JD (134,000).
|
- Construction of independent supports for the cooling
water rings of LPG spheres (S301, S302, S304) out the
Refinery Site, at a total cost of JD (98,300).
|
- Building offices outside Refinery Main Stores hangars,
at a total cost of JD (97,000).
|
|
- Construction of a fence and gates for the Company’s
farm, at a total cost of JD (84,900)
|
|
- Replacing the furniture and cupboards of three halls in
the Main Laboratories of the Refinery, at a total cost of JD
(80,000).
|
|
- Connecting sewage systems of loading and unloading
buildings at the Refinery, as well as Marka Gas Station,
with the public sewage system, at a total cost of JD
(79,000).
|
|
- Repaving and re-asphalting roads and yards around LPG
cylinders filling station No. (2) at Zarka Site, at a total
cost of JD (78,000).
|
|
- Various works: Renovation of Residential Area telephone
network , re-asphalting yards in Amman LPG Filling Station
and construction of reinforced concrete manholes at Aqaba
South area , …etc., at an estimated cost of JD (54,000).
|
|
-
Civil works related to installing additional Tank No.
(15) at Crude Oil Receiving Station, at a total cost of JD
(53,800).
|
|
- Construction of for LPG cylinders storage yard at Amman
LPG filling station, at a total cost of JD (50,000).
|
|
-
Maintenance of houses in the residential area, at
an estimated cost of JD (50,000)
|
|
-
Maintenance of rain water channels at storage tanks area
of the Refinery, at a total cost of JD (39,250).
|
|
- Construction of a concrete room for the main electrical
control panel of Crude Oil Receiving Station, construction
of a vehicles’ ramp for entrance to bunded area of fire
water tank No. 60, and maintenance of reinforced concrete
ground slabs in Topping (1) unit, at a total cost of JD
(36,000) .
|
|
|
|
|
|
Second :Projects in Progress:
|
|
|
Works Related to the Refinery Units:
|
|
- Construction of (4) LPG spherical tanks, of 8000 tons
total capacity, at
- a total cost of JD (27) million. The project awarded to
Consortium of Lotte Engineering and Construction Co., and
Hantech Co. of Korea.
|
|
- Upgrading the capacity of Asphalt Unit from (800) tons
per day to (1,100) tons per day, at a total cost of JD
(650,000).
|
|
- Purchasing a reactor for Naphtha Hydrotreating Unit, at
a total cost of JD (375,000)
|
|
- Modifying fire fighting systems of storage tanks, at a
total cost of JD (180,000).
|
|
- Consulting services specialized in FERM-Fire and
Explosion Management to develop a system for preventing and
fighting fires and explosions, at an estimated cost of JD
(156,000).
|
|
- Purchasing updated in design two Stage Regenerator
Cyclone system for F.C.C. Unit, at an estimated cost of JD
(150,000).
|
|
- Purchasing studded tubes for Naphtha Unit heater to
improve its efficiency, at an estimated cost of JD (60,000).
|
|
|
|
|
- Works Related to LPG Filling Stations, Factories,
Airport Service Stations and Aqaba Depots:
|
|
- Construction of two gasoline storage tanks at South
Aqaba Depot and two jet fuel storage tanks at Queen Alia
International Airport JPRC Station Project, at a total cost
of JD (10.4) million.
|
|
- Purchasing and installing fire detection and alarm
systems, a fire pump driven by diesel engine and a jokey
pump at Main Port Depot, at an estimated cost of JD
(250,000).
|
|
- Upgrading of loading platforms at Aqaba South Depots, at
a total cost of JD (125,000).
|
|
|
|
|
-
Renovating Crude Oil Receiving Station, at a total cost
of JD (342,000)
|
|
- Protection of control rooms in the Refinery of the risk
of explosion at an estimated cost JD (150,000).
|
|
- Various works: Construction of a reinforced concrete
wall for the diked area of a fire water tank at Refinery
site, civil works to separate the Residential Area from the
Refinery , increasing the efficiency of oil separation in
the sludge drying ponds in the Refinery, renovating offices
of fuel orders in Amman, Irbid, and Zarka, …etc., at an
estimated cost of JD (140,000).
|
|
- Construction of a chemical materials’ hangar at the Main
Stores of the
Refinery, at an
estimated cost of JD (74,500)
|
|